Biomass Power Projects

UP TO DATE INFORMATION REGARDING BIOMASS POWER PROJECTS

A total of 11 Biomass power projects of cumulative capacity 97.50 MW are commissioned and in operation in the state which utilize 8.8 Lac Metric ton of paddy straw per annum (Table - I). Two Biomass power project of 14 MW is under execution which shall be commissioned by June 2021 and shall utilize 1.26 Lacs Metric ton of paddy straw per annum (Table- II).

Approval of scheme has been sought from MNRE,GOI for Viability Gap Funding for 300 MW capacity Paddy straw based Biomass power projects @ Rs 5 Cr/MW and Hybrid Solar Biomass power projects , for which Hon'ble Chief Minister Govt. of Punjab has already written a D.O letter dated 08.01.2020 to Union Minister of State (IC), Ministry of Power and New and Renewable Energy to grant Viability Gap Fund @ Rs. 5.00 Crore per MW for Biomass Power Projects and Rs. 3.5 Crore per MW for Biomass Solar Hybrid Power Projects in a phased manner. The existing high tariff of electricity from Biomass plants is unattractive for Power DISCOM and it is ready to purchase power from Biomass Projects based on paddy straw at a maximum of Rs. 5/kwh with a view to address the critical issues of stubble burning and pollution in the state.

Another D.O letter dated. 11.06.2020 from Additional Chief Secretary, Department of NRES, Govt. of Punjab has been written to Secretary, MNRE, Govt. of India requesting to allocate 100 MW standalone Biomass Power Projects and 25 MW Biomass Solar Hybrid Power Projects with CFA of Rs. 3.00 Crore Per MW.  The approval and sanction of this VGF scheme from MNRE, Govt. of India is still awaited.

A DO Letter dated 07.08.2020 was sent to Dr. Bhure Lal, Chairman, Environment Pollution (Prevention and Control) Authority form ACS, NRES, Govt. of Punjab with regard to Viability Gap Funding (VGF) for Biomass Power Projects and seeking intervention in this regard at the level of MNRE, Govt. of India. VGF shall help in reduction of tariff to Rs 5/Kwh of Biomass power plants and shall also lead to utilization of surplus paddy straw in the state, open burning of which is creating huge environmental problems for the State. This shall also provide additional income to farmers, employment opportunities both skilled and unskilled for rural youth and Private sector investment of more than 2500 crores in the RE sector in the state.

It will take two years from the date of signing of PPA for this 100 MW capacity Biomass power projects to be commissioned if GOI approves and sanctions the VGF proposal and these projects post commissioning shall be able to utilize 1 Million tons/annum of paddy straw.

Another DO letter dated 04.09.2020 was sent to Secretary, MNRE, GOI by ACS, NRES requesting approval of VGF proposal for these projects, so that these projects can be set up in the state. MNRE, GOI is yet to approve and sanction this Biomass power scheme with VGF proposed under concept paper @Rs 3 Cr/MW.

TABLE:- I

DETAIL OF BIOMASS POWER PROJECTS COMPLETED / COMMISSIONED USING PADDY STRAW (97.50 MW)

Sr.No.

Name of the Company/ Location of the project

Capacity in MW

Quantity of straw required for plant (mt. per annum)

Status

Catchment Area

1

M/s. Malwa Power Ltd. / Village: Gulabewala, Tehsil & Distt:  Mukatsar

6.00

54000

Commissioned and operational since May 2005

Tehsil : Mukatsar of Distt:  Mukatsar

2

M/s. Dee Development Engineers Pvt. Ltd / Village: Gadda Dhob, Tehsil: Abohar, Distt: Fazilka

8.00

72000

Commissioned and operational since Feb' 2009

Tehsil: Abohar of Distt: Fazilka

3

M/s. Universal Biomass Energy Pvt. Ltd. / Village: Channu, Tehsil: Malout, Distt:  Mukatsar

14.50

130500

Commissioned and operational since Oct'2009

Tehsil: Malout of Distt:  Mukatsar

4

M/s. Green Planet Energy Pvt. Ltd. / Village: Binjon, Tehsil: Garhshankar, Distt; Hoshiarpur

6.00

54000

Commissioned and operational since March'2012

Tehsil: Garhshankar of Distt; Hoshiarpur

5

M/s. Green Planet Energy Pvt. Ltd. / Village: Bir Pind, Tehsil: Nakodar, Distt; Jalandhar

6.00

54000

Commissioned and operational since Feb'2013

Tehsil: Nakodar of Distt; Jalandhar

6

M/s. Viaton Energy Pvt. Ltd. / Village: Khokhar Khurd, Tehsil & Distt: Mansa

10.00

90000

Commissioned and operational since July 2013

 

Tehsil : Mansa of Distt: Mansa

7

M/s. Green Planet Energy Pvt. Ltd. / Village: Binjon, Tehsil: Garhshankar, Distt; Hoshiarpur

4.00

36000

Commissioned and operational since August 2018

Tehsil: Garhshankar of Distt; Hoshiarpur

8

M/s. Green Planet Energy Pvt. Ltd. / Village: Manuke Gill, Tehsil: Baghapurana, Distt: Moga

6.00

54000

Commissioned and operational since August 2019

Tehsil: Baghapuranaof Distt: Moga

9

M/s. Sampuran Agri Venture Pvt. Ltd. / Village: Panchewali, Teshil: Fazilka, Distt: Fazilka

1.00

8000

Commissioned and operational since February 2015

Teshil: Fazilka of Distt: Fazilka

10

M/s. Sukhbir Agro Energy Limited / Village: Sedda Singh Wala Tehsil: Jaitu, Distt: Faridkot

18.00

162000

Commissioned and operational since December 2019

Tehsil: Jaitu of Distt: Faridkot

11

M/s. Sukhbir Agro Energy Limited/ Village: Hukumat Singh Wala,  Tehsil & Distt: Ferozepur

18.00

162000

Commissioned and operational since December 2019

Tehsil: Ferozepur of Distt: Ferozepur

 

Total

97.50

876500
Say 8.8 Lac Metric ton per annum

 

 

TABLE-II
DETAIL OF UNDER EXECUTION BIOMASS POWER PROJECTS (14 MW)


Sr.No.

Name of the Company/ Location of the project

Capacity in MW

Quantity of straw required for plant (mt. per annum)

Status

Catchment Area

1

M/s. Green Planet Energy Pvt. Ltd. / Village: Bir Pind  Tehsil: Nakodar, Distt; Jalandhar

4.00

36000

Under Execution and will be commissioned by August' 2021

Tehsil: Nakodar of Distt; Jalandhar

2

M/s. Sukhbir Agro Energy Limited(PSPCL Jalkheri Project) / Tehsil & Distt: Fatehgarh Sahib

10.00

90000

Under Execution and will be commissioned by June 2021(Project has been allocated by PSPCL.)

Tehsil :  Fatehgarh Sahib  of Distt: Fatehgarh Sahib

 

 

14.00

126000
Say 1.2 Lac Metric ton per annum